Journal of South China University of Technology (Natural Science Edition) ›› 2007, Vol. 35 ›› Issue (9): 101-106.

• Computer Science & Technology • Previous Articles     Next Articles

Scheduling of Flexible Manufacturing System Based on Cooperative Game

Liu Jian-guoLi Qing-song Wang Ning-sheng1   

  1. 1. CIMS Engineering Research Centre , Nanjing Univ. of Aeronautics and Astronautics , Nanjing 210016 , Jiangsu , China;2. Faculty of Computer, Nanchang Hangkong Univ. , Nanchang 330063 , Jiangxi , China
  • Received:2006-12-10 Online:2007-09-25 Published:2007-09-25
  • Contact: 刘建国(1971-) ,男,博士生,主要从事生产调度与人工智能方面的研究。 E-mail:liujianguoniat@ 163. com
  • About author:刘建国(1971-) ,男,博士生,主要从事生产调度与人工智能方面的研究。
  • Supported by:

    国家科技部高新技术基金资助项目(2002E0691036 )

Abstract:

For adapting to the agile manufacturing , an effective and real-time manufacturing scheduling is necessary to the flexible manufacturing system with multi-machining and multi-assemble equipment , as well as with many machining and assembly processes. This paper brings forward a new scheduling algorithm to decompose the assembly structure of the products , obtain simple problems easy to schedule and form the corresponding Agents. Then , by applying the cooperative game theory , the importance and restriction of each Agent are taken into account to obtain an order of simple scheduling problem. In this order, the scheduling of sub-questions can be implemented in term of rules , and the almost optimal scheduling results meeting the restriction can be obtained. Experimental results finally verify the effectiveness of the proposed scheduling algorithm.

Key words: flexible manufacturing system, scheduling, cooperative game, Age