| [1] |
杨清华,柴生波,王秀兰,等 .大跨度钢箱系杆拱桥主拱钢-混结合段受力分析[J].公路工程,2023,48(4):31-36,51.
|
|
YANG Qinghua, CHAI Shengbo, WANG Xiulan,et al .Force analysis of steel and concrete combined segment of main arch for large-span steel box tied arch bridge[J].Highway Engineering,2023,48(4):31-36,51.
|
| [2] |
刘世明,李振豪,张颖达 .连续梁边跨混合梁结合部力学性能有限元分析[J].公路,2020,65(10):122-126.
|
|
LIU Shi-ming, LI Zhen-hao, ZHANG Ying-da .Mechanical behavior analysis on steel-concrete connection part of continuous bridge with side span hybrid beam[J].Highway,2020,65(10):122-126.
|
| [3] |
许世展,怀臣子,杨纪,等 .自锚式悬索桥钢-混结合段局部受力分析[J].公路工程,2019,44(5):1-3,30.
|
|
XU Shizhan, HUAI Chenzi, YANG Ji,et al .Local stress analysis of steel and concrete joint section of self-anchored suspension bridge[J].Highway Engineering,2019,44(5):1-3,30.
|
| [4] |
史灼 .某铁路槽型梁拱桥拱脚局部应力分析[J].工程建设与设计,2021(14):66-68.
|
|
SHI Zhuo .Local stress analysis of the arch foot of a railway trough beam arch bridge[J].Construction & Design for Engineering,2021(14):66-68.
|
| [5] |
邓江涛 .高速铁路槽形连续梁拱桥拱脚局部应力分析与验证[J].铁道标准设计,2019,63(7):92-96.
|
|
DENG Jiang-tao .Local stress analysis and verification of arch foot of high-speed railway continuous channel-beam arch bridge[J].Railway Standard Design,2019,63(7):92-96.
|
| [6] |
崔凤坤,朱谊彪,杜朋,等 .钢管混凝土系杆拱桥拱脚一致多尺度建模及分析[J].江苏大学学报(自然科学版),2017,38(2):211-217.
|
|
CUI Fengkun, ZHU Yibiao, DU Peng,et al .Concurrent multi-scale modeling and analysis of springing joint for CFST tied-arch bridge[J].Journal of Jiangsu University (Natural Science Edition),2017,38(2):211-217.
|
| [7] |
周萌,宁晓旭,聂建国 .系杆拱桥拱脚连接结构受力性能分析的多尺度有限元建模方法[J].工程力学,2015,32(11):150-159.
|
|
ZHOU Meng, NING Xiao-xu, NIE Jian-guo .Multi-scale FEA modeling method for mechanical behavior analysis of arch feet on tied arch bridges[J].Enginee-ring Mechanics,2015,32(11):150-159.
|
| [8] |
刘学强 .下承式系杆拱桥拱脚区域内力分析[J].交通科技,2023(3):75-79.
|
|
LIU Xueqiang .Internal force analysis of arch foot area of through tied arch bridge[J].Transportation Science & Technology,2023(3):75-79.
|
| [9] |
莫家鹏 .钢-混系杆拱桥拱脚施工过程稳定性模拟分析[J].福建交通科技,2022(5):91-94.
|
|
MO Jiapeng .Stability simulation analysis of steel and concrete combined of tie arch bridge footing construction process[J].Transportation Technology of Fujian,2022(5):91-94.
|
| [10] |
AHN J H, LEE C G, WON J H,et al .Shear resistance of the perfobond-rib shear connector depending on concrete strength and rib arrangement[J].Journal of Constructional Steel Research,2010,66(10):1295-1307.
|
| [11] |
黄天贵 .混合梁斜拉桥钢-混凝土结合段受力性能研究[D].北京:清华大学,2016.
|
| [12] |
萨布尼斯G M .结构模型和试验技术[M].北京:中国铁道出版社,1989.
|
| [13] |
李小珍,肖林,黄玲,等 .混合梁斜拉桥钢-混结合段静力行为[J].哈尔滨工业大学学报,2013,45(6):75-82.
|
|
LI Xiaozhen, XIAO Lin, HUANG Ling,et al .Static mechanical behavior of steel-concrete joint section of hybrid beam cable-stayed bridges[J].Journal of Harbin Institute of Technology,2013,45(6):75-82.
|
| [14] |
陈华婷,李德旺,孙平宽,等 .自锚式悬索桥钢混结合段受力性能试验研究[J].哈尔滨工程大学学报,2023,44(5):837-846,856.
|
|
CHEN Huating, LI Dewang, SUN Pingkuan,et al .Experimental investigation on the structural behavior of the steel-concrete composite segments of self-anchored suspension bridges[J].Journal of Harbin Engineering University,2023,44(5):837-846,856.
|
| [15] |
金杰,张君琳,李业,等 .独塔混合梁大跨斜拉桥钢—混结合段的受力分析[J].公路,2023,68(1):111-117.
|
|
JIN Jie, ZHANG Junlin, LI Ye,et al .Mechanical behavior analysis of the steel-concrete composite section in a single-pylon long-span hybrid girder cable-stayed bridge[J].Highway,2023,68(1):111-117.
|
| [16] |
WEI B, ZHANG R M, JIANG L Z,et al .Scale model test and numerical analysis on the anchorage zone of a cable-stayed bridge with the cross-anchor structure[J].Engineering Structures,2024,316:118614/1-17.
|
| [17] |
戴公连,粟淼 .高铁槽形梁斜拉桥塔梁固接结构试验研究及数值分析[J].铁道学报,2015,37(3):85-92.
|
|
DAI Gong-lian, SU Miao .Experimental study and numerical analysis on pylon-girder rigid fixity structure of a trough girder cable-stayed bridge in high-speed railway[J].Journal of the China Railway Society,2015,37(3):85-92.
|