1 |
祖祥胜,刘征宇,柏国清 .钢绞线拉索与钢丝拉索体系的比较[J].安徽建筑,2010,17(3):26-28,41.
|
|
ZU Xiang-sheng, LIU Zheng-yu, Bai Guo-qing .Comparison of steel strand cable and steel wire cable system[J].Anhui Architecture,2010,17(3):26-28,41.
|
2 |
杨吉新,喻桥,石旷,等 .平行钢绞线和平行钢丝斜拉索对比分析[J].工程与建设,2019,33(1):38-40.
|
|
YANG Ji-xin, YU Qiao, SHI Kuang,et al .Comparison and analysis of parallel steel strand and parallel steel wire cable[J].Engineering and Construction,2019,33(1):38-40.
|
3 |
威胜利工程有限公司(中国VSL) .VSL钢绞线斜拉索体系索力控制技术[C]∥2002年全国桥梁学术会议论文集.北京:人民交通出版社,2002:970-981.
|
4 |
董春光 .大跨度钢桁斜拉桥施工控制关键技术研究[D].广州:华南理工大学,2014.
|
5 |
张育智,李乔,唐亮 .宜宾中坝金沙江大桥索力控制研究[J].铁道标准设计,2005(8):27-30.
|
|
ZHANG Yu-zhi, LI Qiao, TANG Liang .Research of cable force control of Zhongba Jinsha river bridge in Yibin[J].Railway Standard Design,2005(8):27-30.
|
6 |
闫维明,张志,陈彦江,等 .大跨度斜拉桥施工过程中的索力控制方法[J].土木建筑与环境工程,2010,32(5):130-134.
|
|
YAN Wei-ming, ZHANG Zhi, CHEN Yan-jiang,et al .Method of cable tension controlling in the long-span cable-stayed bridge construction[J].Journal of Civil,Architectural & Environmental Engineering,2010,32(5):130-134.
|
7 |
冷雪浩,林乐强,黄伟东 .平行钢绞线斜拉索单根钢绞线张拉过程中的索力控制[J].北方交通,2008(1):83-84.
|
|
LENG Xue-hao, LIN Le-qing, HUANG Wei-dong .Control of cable force in the process of stretching the single strand of parallel strand stayed-cable[J].Northern Communications,2008(1):83-84.
|
8 |
邹力,彭旭民,位东升 .平行钢绞线斜拉索等值张拉力精确计算方法[J].重庆交通大学学报(自然科学版),2015,34(2):7-9,44.
|
|
ZOU Li, PENG Xu-min, WEI Dong-sheng .Accurate calculation method of equal tensile force of parallel strand stayed-cable[J].Journal of Chongqing Jiaotong University (Natural Science),2015,34(2):7-9,44.
|
9 |
周正茂,龚振球,王素娟 .倒退分析法确定拉索中钢绞线的张拉力[J].公路交通科技,2009,26(4):73-77.
|
|
ZHOU Zheng-mao, GONG Zhen-qiu, WANG Su-juan .Tension control for strands in cables based on reverse analysis[J].Journal of Highway and Transportation Research and Development,2009,26(4):73-77.
|
10 |
庄冬利,许骏,肖汝诚 .分阶段单根张拉的平行钢绞线斜拉索张拉力简化计算方法的研究[C]∥第二十一届全国桥梁学术会议论文集(上册).北京:人民交通出版社,2014:422-428.
|
11 |
苑仁安,秦顺全 .无应力状态法在钢绞线斜拉索施工中的应用[J].桥梁建设,2012,42(3):75-79.
|
|
YUAN Ren-an, QIN Shun-quan .Application of unstressed state method to construction of steel strand stay cable[J].Bridge Construction,2012,42(3):75-79.
|
12 |
张卓杰,王荣辉 .求解平行钢绞线斜拉索初张力的数值算法[J].华南理工大学学报(自然科学版),2014,42(2):88-95,102.
|
|
ZHANG Zhuo-jie, WANG Rong-hui .Numerical method of determining installation force for parallel strand cables[J].Journal of South China University of Technology(Natural Science Edition),2014,42(2):88-95,102.
|
13 |
任明飞,袁波,王科 .平行钢绞线斜拉索单股首次张拉力计算方法研究及ExcelVBA程序编制[J].城市道桥与防洪,2016(8):271-273,301,26.
|
|
REN Ming-fei, YUAN Bo, WANG Ke .Study on calculation method of initial single-strand tension force of parallel steel strand stay cable and ExcelVBA programming[J].Urban Roads Bridges & Flood Control,2016(8):271-273,301,26.
|
14 |
陈太聪,马海涛,苏成 .拉索静力状态的高精度无迭代求解方法研究[J].工程力学,2013,30(3):244-250.
|
|
CHEN Tai-cong, MA Hai-tao, SU Cheng .Study on high-accuracy and non-iteration methods for determining static status of a cable[J].Engineering Mechanics,2013,30(3):244-250.
|
15 |
GRADSHTEYN I S, RYZHIK I M .Table of integrals,series,and products[M].8th ed.San Diego:Academic Press,2014:42-44.
|