Feasibility Study on Energy Harvesting Around AC Transmission Line Based on Electric Potential

Zhao Dong-sheng1 Dai Dong1 Deng Hong-leiLi Li-cheng1 Zhai Shao-lei2 Cao Min2   

  1. 1. School of Electric Power,South China University of Technology,Guangzhou 510640,Guangdong,China;2. Electric Power Research Institute,Yunnan Electric Power Test & Research Institute Group Co. ,Ltd. ,Kunming 650217,Yunnan,China
  • Received:2014-10-28 Revised:2014-12-09 Online:2015-04-25 Published:2015-03-03
  • Contact: 戴栋(1976-),男,教授,博士生导师,主要从事输电线路在线监测技术、非线性理论研究. E-mail:ddai@scut.edu.cn
  • About author:赵东生(1980-),男,博士生,主要从事输电线路在线监测技术研究. E-mail: zds_gz@126. com
  • Supported by:
    Supported by the National High-tech R&D Program of China (863 Program)(2011AA05A120)

Abstract: Proposed in this paper is a method of utilizing a capacitive transducer to harvest the electric potential energy stored in the space around the AC transmission line,which helps to supply power to the on-line -monitoring system installed on a transmission tower. First,the circuit model of the potential energy-harvesting system and the relationship between the load resistance and the output power are analyzed,and a way to harvesting the maximum energy is presented. Then,the electric field distribution at the tower head of a 500kV AC double-loop transmission line is simulated,and the places suitable for transducer installation are determined. Finally,an experiment is con-ducted by adopting a capacitive transducer with a radius of 40cm and an interval of 15cm,and about 5mJ of energy is obtained at 50kV in 24s,which means that the capacitive transducer can afford an output power of 208 μW to meet the minimum power limit of wireless sensor nodes. In practically application,there is higher operating voltage compared with the experiment,by utilizing the high-intensity electric field efficiently on the tower with optimized capacitive transducer,enough energy will be harvested to power the on-line -monitoring system.

Key words: electric transmission line, tower, electric potential energy, energy harvesting