Architecture & Civil Engineering

Numerical Method of Determining Installation Force for Parallel Strand Cables

Expand
  • School of Civil Engineering and Transportation,South China University of Technology,Guangzhou 510640,Guangdong,China
张卓杰(1986-),男,博士生,主要从事大跨度桥梁结构理论研究.

Received date: 2013-06-06

  Revised date: 2013-10-16

  Online published: 2014-01-02

Supported by

国家自然科学基金资助项目(51378220)

Abstract

Based on the basic stretch- draw principle of parallel strand stay cables,formulas respectively describingthe configuration of target state and the unstressed cable length were set up according to the catenary theory.Then,two problems existing in the stretch- draw process of parallel strand stay cables were put forward,and the corre-sponding solving methods were proposed and a calculation program was compiled with Matlab to determine the sin-gle strand initial tension.Finally,a case study on the Tongling rail- road cable- stayed bridge under construction wasconducted.The results show that the proposed method is effective and reliable,and that it may provide theoreticalreferences for the construction of parallel strand stay cables.

Cite this article

Zhang Zhuo- jie Wang Rong- hui . Numerical Method of Determining Installation Force for Parallel Strand Cables[J]. Journal of South China University of Technology(Natural Science), 2014 , 42(2) : 88 -95,102 . DOI: 10.3969/j.issn.1000-565X.2014.02.014

Outlines

/