Modeling and Balance Point Characteristics of Bucket Brigades Assembly Line
Received date: 2013-11-04
Revised date: 2014-01-28
Online published: 2014-03-03
Supported by
国防 “十二五” 预研资助项目;中国博士后科学基金资助项目(2012M511268);江苏省博士后科研资助计划项目(1102053C)
刘俨后 左敦稳 张丹 . 斗链装配线的建模与平衡点特性[J]. 华南理工大学学报(自然科学版), 2014 , 42(4) : 111 -117 . DOI: 10.3969/j.issn.1000-565X.2014.04.017
According to the difference in station constraints,the bucket brigades assembly line (BBAL) is dividedinto three types,namely BBAL-1,BBAL-2 and BBAL-3,and the corresponding mathematical models are estab-lished to comparatively investigate the self- balancing and self- organizing performance of the three types of BBALs.It is found that (1) both BBAL-1 and BBAL-2 possess only one balance point and good convergence from anystates to the balance point; (2) the balance point of BBAL-3 is of uncertainty; and (3) BBAL-3 becomes self- ba-lanced at the balance point if the point exists,even though it cannot converge to the balance point from any states.The above- mentioned conclusions are finally proved by numerical simulations.
/
| 〈 |
|
〉 |