华南理工大学学报(自然科学版) ›› 2007, Vol. 35 ›› Issue (3): 127-131.

• 土木建筑工程 • 上一篇    下一篇

斜拉桥扁平空腹钢箱梁悬拼施王时的截面变形

徐金勇1 颜全胜2 王卫锋2 韩大建1   

  1. 1.华南理工大学 建筑学院,广东 广州 510640;2.华南理工大学 交通学院,广东 广州 510640
  • 收稿日期:2006-09-18 出版日期:2007-03-25 发布日期:2007-03-25
  • 通信作者: 徐金勇(1978-),男,博士生,主要从事大跨度斜拉桥施工控制及极限承载力的研究。 E-mail:celxu@163.com
  • 作者简介:徐金勇(1978-),男,博士生,主要从事大跨度斜拉桥施工控制及极限承载力的研究。

Section Deformation of Flat Hollow Steel Box Girder of Cable-Stayed Bridge During Cantilever Erection

Xu Jin-yongYan Quan-sheng2  wang Wei-feng2  Han Da-jian1   

  1. 1. School of Architecture and Civil Engineering , South China Univ. of Tech. , Guangzhou 510640 , Guangdong , China;2. School of Traffic and communications , South China Univ. of Tech. , Guangzhou 510640 , Guangdong , China
  • Received:2006-09-18 Online:2007-03-25 Published:2007-03-25
  • Contact: 徐金勇(1978-),男,博士生,主要从事大跨度斜拉桥施工控制及极限承载力的研究。 E-mail:celxu@163.com
  • About author:徐金勇(1978-),男,博士生,主要从事大跨度斜拉桥施工控制及极限承载力的研究。

摘要: 湛江海湾大桥主桥是一主跨为480m 的双塔空间双索面混合梁斜拉桥,钢主梁采用扁平空腹流线型钢箱梁,标准梁段横隔板和纵隔板均为椅架式.在悬臂拼装施工过程中,吊机作用梁段与被吊梁段受力不同,在两段梁的接口处存在较大的变形差异.文中采用混合羊元建立被吊梁段与吊机作用梁段的三维有限元模型,分析了悬臂拼苯阶段钢箱梁拼接口的相对变形,研究了纵横隔街架刚度等参数对变形的影响.分析表明,大跨度斜拉桥采用全空腹钢箱是可行的,相对变形的大小取决于箱梁的整体刚度和吊机的横向着力点.

关键词: 斜拉桥, 扁平空腹钢箱梁, 截面变形, 有限元模型

Abstract:

The Zhanjiang Bay bridge with a main span of 480 m is a two-pylon cable-stayed .bridge with spatial double-cable planes and hybrid girders. The steel girder of the bridge is flat hollow streamline steel box girder with truss-form diaphragms and intemal webs. As the loads on the segment being lifted differ from those on the segment supporting the crane , the two segment splices are of various section deformations during the cantilever erection. In order to reveal the relative deformation of box girder sections during the cantilever erection , the 3D finite element models of the segment being lifted and supporting the crane are established via the mixed element method. The in-fluences of several parameters including the truss stiffness on the deformation are then analyzed. The results indicate that the flat hollow steel box girder with truss-form diaphragms and intemal webs is feasible to long-span cable-stayed bridges , and that the relative deformation of the box girder is govemed by the transverse location of crane-acting
point and the global stiffness of the steel box girder.

Key words: cable-stayed bridge, flat hollow steel box girder, section deformation, finite element model