收稿日期: 2010-05-27
修回日期: 2011-07-15
网络出版日期: 2011-09-01
基金资助
广东省部产学研合作项目( 2010B090400137)
Lightning Strike Risk Evaluation of Power Grid with Distributed Hydropower
Received date: 2010-05-27
Revised date: 2011-07-15
Online published: 2011-09-01
Supported by
广东省部产学研合作项目( 2010B090400137)
张勇军 黄慧 刘洋海 陈志峰 . 含分布式水电的电网雷击风险评估[J]. 华南理工大学学报(自然科学版), 2011 , 39(10) : 127 -131 . DOI: 10.3969/j.issn.1000-565X.2011.10.022
In this paper,the existing lightning strike protection problems of distributed hydropower grid are analyzed in terms of grid-connected hydropower lines,hydropower stations and customers,and the lightning strike risk composition and risk sharing differences between grid-connected hydropower lines and normal ones are presented. Then,the lightning strike risk index is proposed. Moreover,a lightning strike risk evaluation model for the power
grid with distributed hydropower is established,which considers the lightning strike exposure,the probability of line failure,and the losses. Finally,this model is used for evaluating Shaoguan power grid which contains various hydropower stations. It is found that lightnig risks mainly occcur on the grid-connected hydropower lines rather than the normal ones,and that lightning strikes may result in high power failure and severe waste of renewable resources. The paper points out that such lightning strike risks can only be avoided by building smart distribution grids and enhancing the electricity market. To this end,several measures to reduce lightning strike risks are also proposed.
Key words: distributed grid; hydropower; lightning strike; risk
/
| 〈 |
|
〉 |