收稿日期: 2009-09-03
修回日期: 2009-11-09
网络出版日期: 2010-06-25
基金资助
国家“863”计划项目(2007AA04Z111)
Job-Shop Scheduling Based on Analytical Target Cascading
Received date: 2009-09-03
Revised date: 2009-11-09
Online published: 2010-06-25
Supported by
国家“863”计划项目(2007AA04Z111)
黄英杰 姚锡凡 颜亮 余铭奇 . 基于目标级联法的作业车间调度[J]. 华南理工大学学报(自然科学版), 2010 , 38(6) : 128 -133 . DOI: 10.3969/j.issn.1000-565X.2010.06.024
In order to solve large-scale job-shop scheduling problems,a hierarchical job-shop scheduling model is established based on the analytical target cascading for hierarchical optimization.Then,by taking two part-manufacturing cells as examples,the effectiveness of the model is verified.Experimental results indicate that the established model can not only solve large-scale job-shop scheduling problem but also dynamically and rationally arrange machines and workpiece-processing paths for each manufacturing cell according to the machining time and the workpiece number.
/
| 〈 |
|
〉 |