收稿日期: 2009-07-03
修回日期: 2009-08-06
网络出版日期: 2010-05-25
基金资助
国家自然科学基金资助项目(50805051); 广东省科技计划项目(2008B010400041); 中央高校基本科研业务费专项资金资助项目(2009ZM0188)
All-Position Automatic Welding Process for Tube Sheet of Heat Exchanger
Received date: 2009-07-03
Revised date: 2009-08-06
Online published: 2010-05-25
Supported by
国家自然科学基金资助项目(50805051); 广东省科技计划项目(2008B010400041); 中央高校基本科研业务费专项资金资助项目(2009ZM0188)
王振民 张栋 李晋 黄石生 . 换热器管板的全位置自动化焊接工艺[J]. 华南理工大学学报(自然科学版), 2010 , 38(5) : 100 -104 . DOI: 10.3969/j.issn.1000-565X.2010.05.020
In this paper,the characteristics of the all-position automatic welding procsss for the titanium alloy tube sheet of heat exchanger were analyzed in detail,and some experiments were carried out by using a self-developed full-digital tube sheet welding system.Then,the effects of the main process parameters on the welding quality were explored,and optimal conditions for the welding were determined,that is,a peak current of 80~100A,a base current of 20~30A,a pulse current frequency of 5~10Hz,a duty ratio of 50%,a rotating speed of 3~4r/min and a pulse mode for the current rising and falling.Finally,the correctness of the optimal conditions was verified by the on-site welding of tube sheet of heat exchanger for a 1GW supercritical thermal-power generating unit.
/
| 〈 |
|
〉 |