收稿日期: 2019-05-23
修回日期: 2020-02-27
网络出版日期: 2020-07-01
基金资助
国家自然科学基金资助项目 (51777079)
A New Method for Calculating the Operation Times of Lightning Arresters with Fixed Clearance on Transmission Lines#br#
Received date: 2019-05-23
Revised date: 2020-02-27
Online published: 2020-07-01
Supported by
Supported by the National Natural Science Foundation of China (51777079)
邓红雷, 唐崇旺, 刘刚, 等 . 输电线路带固定间隙避雷器动作次数计算新方法[J]. 华南理工大学学报(自然科学版), 2020 , 48(7) : 20 -27 . DOI: 10.12141/j.issn.1000-565X.190292
/
| 〈 |
|
〉 |