收稿日期: 2013-06-06
修回日期: 2013-10-16
网络出版日期: 2014-01-02
基金资助
国家自然科学基金资助项目(51378220)
Numerical Method of Determining Installation Force for Parallel Strand Cables
Received date: 2013-06-06
Revised date: 2013-10-16
Online published: 2014-01-02
Supported by
国家自然科学基金资助项目(51378220)
张卓杰 王荣辉 . 求解平行钢绞线斜拉索初张力的数值算法[J]. 华南理工大学学报(自然科学版), 2014 , 42(2) : 88 -95,102 . DOI: 10.3969/j.issn.1000-565X.2014.02.014
Based on the basic stretch- draw principle of parallel strand stay cables,formulas respectively describingthe configuration of target state and the unstressed cable length were set up according to the catenary theory.Then,two problems existing in the stretch- draw process of parallel strand stay cables were put forward,and the corre-sponding solving methods were proposed and a calculation program was compiled with Matlab to determine the sin-gle strand initial tension.Finally,a case study on the Tongling rail- road cable- stayed bridge under construction wasconducted.The results show that the proposed method is effective and reliable,and that it may provide theoreticalreferences for the construction of parallel strand stay cables.
/
| 〈 |
|
〉 |