收稿日期: 2012-07-06
修回日期: 2013-02-25
网络出版日期: 2013-04-01
基金资助
国家“863”计划项目( 2012AA050201)
Risk Evaluation of Reactive Power / Voltage Control Mismatch and Corresponding System Development
Received date: 2012-07-06
Revised date: 2013-02-25
Online published: 2013-04-01
Supported by
国家“863”计划项目( 2012AA050201)
李峰 张勇军 张豪 杨银国 管霖 许亮 . 无功电压调控失配风险评估及其系统开发[J]. 华南理工大学学报(自然科学版), 2013 , 41(5) : 99 -104 . DOI: 10.3969/j.issn.1000-565X.2013.05.016
As the reactive power /voltage control mismatch between the upper and the lower power networks may resultin danger and uneconomic power network operation,a model to evaluate the mismatch risk is proposed after analyzingthe concept of mismatch.In this model,a mismatch risk index is constructed by quantizing the high-sidevoltage,the low-side voltage,the available reactive power and the reactive power on power network boundaries.Moreover,a combinatorial analysis system of reactive power /voltage control is developed,which has such functionsas device account managenment,power flow analysis,mismatch risk evaluation and anti-mismatch strategy test.Case study results show that the proposed system is practical and feasible.
Key words: reactive power; automatic voltage control; mismatch; power system; risk evaluation
/
| 〈 |
|
〉 |